Updates and Details

  • Schedule

    Action Sports Constructions has been hired to build our park and have started working on site!


    Next Steps

    Steps to select a contractor to build the Quarry Park Pump track are in motion. Designs are complete, permits have been obtained, and the call for construction bids will be posted in January 2022.

    While the department had scheduled site grading to begin mid-September, the need to complete the first phase of Quarry Park’s fuel reduction project near the meadow took precedence and ensures no conflict between fuel reduction work and pump track construction moving forward. Construction is expected to begin mid-to-late spring 2022.

  • Project Plans For Construction out for bid!

    San Mateo County parks has released the Bid package for contractors to bid on !

  • Pump Track Preferred Concept



    Input gathered during community meetings and a survey conducted in November have informed development of the preferred concept for the pump track at Quarry Park. The preferred concept will be presented to the Parks Commission and Board of Supervisors this winter as well as Granada Community Services District.

  • Community Outreach

    Pump Track Virtual Workshop, Nov 4

    On Wednesday, November 4th, members of the community join us in a virtual workshop for the design of a new pump track at Quarry Park.

NOTICE INVITING BIDS FOR CONSTRUCTION The County of San Mateo, Parks Department, Quarry Park Pump Track Project Notice is hereby given that the County of San Mateo (“County”), Parks Department, is seeking bids for the construction of a bike pump track at Quarry Park, located at Santa Maria Ave & Columbus Street, El Granada , CA 94019 (”Project”). Pursuant to Section 22036 of the California Public Contract Code.

The estimated cost for this Project is $265,000.

Project scope is to construct a bicycle “Pump Track” that includes rough grading, highly specialized finished grading for the bike tracks and features, site furnishings, chainlink fencing, and signage in accordance with the bid documents.

Bid documents must be sealed, marked with the project name and bid title. All Bids must be received at the County of San Mateo Parks Department, at 455 County Center, Fourth-floor, Redwood City, CA 94063 on February 16, 2022 BEFORE 2:00:00 p.m.


MANDATORY PREQUALIFICATION

This project includes major scopes of work that require very specific installation expertise. All Bidders must be prequalified on or before January 26, 2022 to be eligible to bid on this project. If a General Contractor bidding this work is not self-performing the specialized scopes of work, then its sub-contractor performing the work must be pre-qualified. Requirements for pre-qualification are as follows:

1. Contractors bidding the Pump Track features as described in the bid documents shall have satisfactorily completed the installation of (3 minimum number) similar projects in accordance with the project plans and written specifications. Qualifying projects must include Pump Track or Skate Park projects with specific terrain of comparable size, type and layout built within the last six (6) years.

2. Only Pump Track or Skate Park projects where the contractor bidding the specialty work has performed all of the same work as described herein shall be considered as acceptable projects to evidence credible experience and qualifications of the bidding Contractor.

3. The Pump Track specialty contractor shall provide references for three (3) qualifying projects including location of qualifying projects, size, owner, budget and owners contact information.

This is a Prevailing Wage Rate project subject to compliance, monitoring, and enforcement. Respondents must be Dept. of Industrial Relations (DIR) registered at time of submitting bid.


To submit questions regarding this bid, or to receive a copy of the Prequalification Questionnaire, plans and specifications, please contact the Project Manager, Mr. Mike Wassermann, at mike@capitalpm.com.